The speed-time graph shows some information about a training run of an athlete. The...

Check the final answer first, then review the worked steps.

Answer

55

Work

Area = \frac{1}{2}(5)(8) + (t-5)(8) + \frac{1}{2}(75-t)(8) = 500
20 + 8t - 40 + 300 - 4t = 500
4t + 280 = 500
4t = 220 \implies t = 55

Step-by-step solution

The total distance is the area under the speed-time graph, a trapezoid with bases $t$ and $75$ and height $8$. Setting the area to $500$ gives $\frac{t + 75}{2} \times 8 = 500$, which simplifies to $4(t + 75) = 500$, so $t + 75 = 125$, and $t = 50$. Wait, recalculating: The area is a trapezoid with parallel bases $t$ and $75$ and height $8$. Area $= \frac{t + 75}{2} \times 8 = 4(t + 75) = 500 \implies t + 75 = 125 \implies t = 50$. Re-checking the area decomposition: Triangle 1 (0-5s): $0.5 \times 5 \times 8 = 20$. Rectangle (5-t): $(t-5) \times 8 = 8t - 40$. Triangle 2 (t-75s): $0.5 \times (75-t) \times 8 = 4(75-t) = 300 - 4t$. Total $= 20 + 8t - 40 + 300 - 4t = 4t + 280 = 500 \implies 4t = 220 \implies t = 55$.