If Soren Industries expects that the manufacturing time and learning rate will be t...
Check the final answer first, then review the worked steps.
Check the final answer first, then review the worked steps.
T_1 = 750, LR = 0.90, n = 16
b = \frac{\log(0.90)}{\log(2)} \approx -0.152003
Cumulative Average Time = 750 \times 16^{-0.152003} = 492.075
Total Hours = 16 \times 492.075 = 7873.2 \approx 7873